|
<< Click to Display Table of Contents >> Navigation: Sewsan 6 User Guide > Program history, background and theory > Identification of Bottlenecks in the System |
Should the accumulated flow at a specific manhole become larger than the capacity of the immediately downstream pipe, overflow will occur at the manhole. Such a point constitutes a bottleneck in the system.
When the option to analyse overflow is on, only the capacity of the pipe is routed further downstream. The peak at the bottleneck is therefore effectively cut off. Overflow volume is stored at the manhole until the flow at the manhole again becomes less than the capacity of the pipe, where after the stored volume is taken up in the pipe and routed downstream. This option may be used to investigate the reduction of peak flow with the use of a "throttle pipe", coupled with a storage facility.
With the above option, the peak flow at the bottleneck is effectively cut off, and does not affect pipes further downstream. This may lead to a false impression that all downstream pipes are sufficient, whereas they may not be if they are forced to accommodate the actual peak flow. The analyse overflow option may therefore be switched OFF, in which case the peak flow at the pipe will not be cut off, but will be routed further downstream to affect all downstream pipes. Overflow volumes can not be calculated in such a case and manholes where overflows occur are merely "flagged" for easy identification.