|
<< Click to Display Table of Contents >> Navigation: Sewsan 6 Tutorial > Sewsan 6 Tutorial: step-by-step > Alternative way of compiling a model from a CAD drawing > Additional steps to complete the model input for subsequent analysis |
In order to make this a proper workable model, similar to the model created in the first part of the example, the following additional actions are still required:
•The appropriate structure must be converted to a Pump Structure, and the pump data added;
•The appropriate structure must be converted to a Conservancy Tank;
•Ground elevations must be populated with the DTM;
•Assign landuse and water demands to the appropriate structures;
•User data fields must be populated.
These steps will not be repeated in this tutorial, as they duplicate exactly what has been done before. However, the diligent user may want to perform these for own accord, and can then later analyse the system and compare the results, in order to verify that everything was done properly.