<< Click to Display Table of Contents >> Navigation: Sewsan 6 Tutorial > Sewsan 6 Tutorial: step-by-step > Planning analysis (time simulation design) |
In this step, we will run a design procedure (planning analysis) on an existing sewer system.
During this procedure, the model is simulated several times. At the end of each simulation iteration, decisions are made according to predefined design parameters. E.g. if a model entity, such as a gravity pipe, is found to have insufficient spare capacity, the size will be increased to the next available diameter (from a preloaded list of options: the cost function tables). This will continue until no further upgrades are required, or until the maximum number of design iterations are achieved.
First, before opening the system data, ensure that the previously loaded model is closed via Manage Models > Close Model. Alternatively, exit and restart the program.
The system data can be opened via Manage Models > Load Model. A dialog box will appear, with which you can browse to the Documents\GLS\Sewsan\ directory, and with which you can select the Sewsan 6 - Tutorial RunDesign.slz file. When this file is loaded, it replaces all the system data that was open before, with the new information. Note that you will have to, again, load in the Unit Hydrographs and Rain Storm files, since these data sets are not stored as part of the model (*.sewslt/*.slz) file. Then, continuing with the following:
•Performing system design checks