|
<< Click to Display Table of Contents >> Navigation: Sewsan 6 Tutorial > Sewsan 6 Tutorial: step-by-step > Planning analysis (time simulation design) > Updating results to model |
At the end of the design procedure, the user can view the design results, which will be available in all the various model layer tables, within the design field group. It is worth noting that these fields will only be available until a new hydraulic analysis is performed. Information from the design can then be copied back to the model, e.g. design type or possible parallel pipe diameter (as an alternative to the normal replacement option). A function is available to copy the results of the planning analysis to relevant user/memo fields, to store the resultant replacement and upgrade options. From the main menu, select Model Data > Model Tools > Copy Data > Design Results to User Fields to copy the data as shown below. For this example, select No at the prompt to copy the design slope and slope type.
Gravity pipes:
Design Result Field |
Copy to Field |
Comment |
New_Diameter |
Diameter |
Update the diameter for subsequent analyses |
New_Diameter |
MP_New_Diam |
Store required diameter from design in master plan memo fields |
Parallel_Diameter |
MP_Par_Diam |
Store parallel required diameter from design in master plan memo fields |
Design_Flow |
MP_Design_Flow |
Store flow, as modelled in design analysis, in master plan memo fields |
Design_Type |
MP_Design_Type |
Store reason for upgrade in master plan memo fields |
Design_Slope_Type |
Slope_Type |
Copy Slope_Type ''M", if user selects Yes to copy |
Design_Slope |
User_Defined_Slope |
Copy slope, if user selects Yes to copy |
Rising mains:
Design Result Field |
Copy to Field |
Comment |
New_Diameter |
Diameter |
Update the diameter for subsequent analyses |
New_Diameter |
MP_New_Diam |
Store required diameter from design in master plan memo fields |
Parallel_Diameter |
MP_Par_Diam |
Store parallel required diameter from design in master plan memo fields |
Design_Flow |
MP_Design_Flow |
Store flow, as modelled in design analysis, in master plan memo fields |
Design_Type |
MP_Design_Type |
Store reason for upgrade in master plan memo fields |
Pumps and Pump structures:
Design results for pumps depend on the number of operational and standby pumps, and the selection of a main pump (i.e. Pump 1 in the tutorial). These rather complex pump design results, and the copying of it back to the pump structure, should rather be conducted manually.