Updating results to model

<< Click to Display Table of Contents >>

Navigation:  Sewsan 6 Tutorial > Sewsan 6 Tutorial: step-by-step > Planning analysis (time simulation design) >

Updating results to model

At the end of the design procedure, the user can view the design results, which will be available in all the various model layer tables, within the design field group. It is worth noting that these fields will only be available until a new hydraulic analysis is performed. Information from the design can then be copied back to the model, e.g. design type or possible parallel pipe diameter (as an alternative to the normal replacement option). A function is available to copy the results of the planning analysis to relevant user/memo fields, to store the resultant replacement and upgrade options. From the main menu, select Model Data > Model Tools > Copy Data > Design Results to User Fields to copy the data as shown below. For this example, select No at the prompt to copy the design slope and slope type.

 

Gravity pipes:

 

Design Result Field

Copy to Field

Comment

New_Diameter

Diameter

Update the diameter for subsequent analyses

New_Diameter

MP_New_Diam

Store required diameter from design in master plan memo fields

Parallel_Diameter

MP_Par_Diam

Store parallel required diameter from design in master plan memo fields

Design_Flow

MP_Design_Flow

Store flow, as modelled in design analysis, in master plan memo fields

Design_Type

MP_Design_Type

Store reason for upgrade in master plan memo fields

Design_Slope_Type

Slope_Type

Copy Slope_Type ''M", if user selects Yes to copy

Design_Slope

User_Defined_Slope

Copy slope, if user selects Yes to copy

 

 

Rising mains:

 

Design Result Field

Copy to Field

Comment

New_Diameter

Diameter

Update the diameter for subsequent analyses

New_Diameter

MP_New_Diam

Store required diameter from design in master plan memo fields

Parallel_Diameter

MP_Par_Diam

Store parallel required diameter from design in master plan memo fields

Design_Flow

MP_Design_Flow

Store flow, as modelled in design analysis, in master plan memo fields

Design_Type

MP_Design_Type

Store reason for upgrade in master plan memo fields

 

 

Pumps and Pump structures:

 

Design results for pumps depend on the number of operational and standby pumps, and the selection of a main pump (i.e. Pump 1 in the tutorial). These rather complex pump design results, and the copying of it back to the pump structure, should rather be conducted manually.