|
<< Click to Display Table of Contents >> Navigation: Sewsan 6 User Guide > Appendix > APPENDIX A: Field Descriptions > Pipe Fields |
Units: m
Status: Data
An additional pipe length can be added to a pipe for the calculation of additional infiltration and storm water. Secondary pipes usually have low sewage flows and are therefore not modeled in the network. Additional infiltration and storm water from these pipes will, however, discharge into the system and must therefore be taken into account.
The additional pipe diameter (in the analysis settings) is used for the infiltration flow calculation.
Units: m/m
Status: Data - calculated
The displayed value depends on the pipe's slope type:
•Slope type = I (Inverts)
The calculated slope of the pipe. It is the difference between the upstream and downstream invert levels relative to the pipe length. The pipe inverts at intermediates are not used in the calculation.
•Slope type = S (Slope)
User defined slope is not displayed in this field, it has its own field.
•Slope type = M (Minimum)
The minimum slope is calculated.
•Slope type = FM (Fixed Minimum)
The minimum slope for the initial diameter is calculated
•If the slope type is 'E'
The calculated slope determined from the upstream and downstream pipes during the calculate user slope function.
Units: None
Status: Data
Numeric value to define the pipe's cost function for planning analyses and for determining the pipe's value.
Units: m/s
Status: Data
The user specified design criterion for the rising mains. If the simulated velocity exceeds the design maximum velocity the rising main's diameter will be increased in a planning analysis.
Units: m/s
Status: Data
The user specified design criterion for the pipes.
In gravity pipes if the simulated velocity is less than the design minimum velocity the design criterion are violated.
In rising mains the user is warned if the simulated velocity is less than the design minimum velocity.
Units:m/m
Status: Planning Results
The design slope as modelled during a planning analysis.
Units: none
Status: Planning Results
The design slope type as modelled during a planning analysis.
Units: Percentage
Status: Data
The user specified design criterion for the pipe. If the relative spare capacity is less than the design spare capacity for the pipe the design criterion for the pipe is violated and the pipe's diameter will be increased in the planning analysis.
Units: L/s
Status: When Planning Results are copied to model
The design flow as modelled during the planning analysis.
Note the MP Design Flow field is only updated when the planning results are copied to the model.
Units: None
Status: When Planning Results are copied to model
Flags the reason for the change in pipe diameter made during a planning analysis. Values include:
•Capacity: The relative spare capacity was less than the design spare capacity
•Velocity: The gravity pipe's velocity was less than the minimum pipe velocity or in the case of rising mains the pipes velocity exceeded the maximum design velocity
•Continuity: The pipes diameter was less than its upstream diameter
Note the MP Design Type field is only updated when the planning results are copied to the model.
Units: mm
Status: Data
The diameter of the pipe.
Units: None
Status: Data
Indicates whether the pipe exists (True) or whether it is a new pipe (False). This information is used in the planning analysis.
Units: None
Status: Data
The code of the upstream manhole.
The N icon will perform the Select New Upstream Structure function.
Units: m
Status: Data
The cover level of the upstream manhole.
From Ground Level
Units: m
Status: Data
The ground level of the upstream manhole.
Units: m
Status: Data
The upstream invert level of the pipe. The value should remain blank if no information is available. Entering a 0 value means that the level is at sea level.
Units: L/s
Status: Result
The flow (capacity) of the gravity pipe when it is flowing 100% full. The capacity is calculated using the Manning's equation:

where
Q full = Capacity
v full = Full velocity
A = Area
D = Diameter
Units: m/s
Status: Data
The velocity in the gravity pipe when it is flowing 100% full. The velocity is calculated using the Manning's equation:

where
vfull = Full Velocity
n = Manning's roughness
D = Diameter
So = Slope
Hydraulic Spare Capacity (L/s)
Units: L/s
Status: Data
The difference between the capacity of the pipe and the maximum flow in the pipe, expressed in terms of flow (L/s).
Refer to calculation of pipe spare capacity for details.
Units: Percentage
Status: Result
The amount of spare capacity in the pipe, regardless of the influence of upstream pumps, expressed as a percentage of the total capacity of the pipe.
Refer to calculation of pipe spare capacity for details.
Units: Flow/pipe length/pipe diameter
Status: Data
The parameter used to calculate the ground water infiltration into the pipe. Ground water infiltration into the system through joints and connections at manholes and pipes. It is a constant flow and a function of length and diameter. A rate of 0.15 litres/min/meter length/meter diameter is typical.
Units: Flow
Status: Planning Result (Initial Data)
The capacity of the pipe before the pipe diameter was determined in the planning analysis. Allows the user to compare the designed and the initial pipe capacity.
Units: Diameter
Status: Planning Result (Initial Data)
The diameter of the pipe before the new pipe diameter was determined in the planning analysis. Allows the user to compare the designed and the initial diameters.
If after the planning analysis the user accepts the planning results the initial diameter becomes the original diameter in the model data.
Units: Velocity
Status: Planning Result (Initial Data)
The velocity of the pipe before the new pipe diameter was determined in the planning analysis. Allows the user to compare the results and the initial velocity.
Abbreviation: Initial Max Velocity
Units: Velocity
Status: Result
Maximum velocity in the rising main before it is designed. The velocity in the rising main equals the maximum flow in the pipe divided by its area.
Units: Slope
Status: Planning Result (Initial Data)
The slope of the pipe before the new pipe diameter was determined in the planning analysis. Allows the user to compare any changes to the slope. The slope type is only changed if the initial slope was a minimum slope type.
If after the planning analysis the user accepts the planning results the initial slope becomes the original slope in the model data.
Units: Various
Status: Data
Intermediates represent the positions in the pipe where the pipe's direction or slope changes.
Intermediates have the following data:
•X and Y co-ordinates: represent the position of the intermediate on the XY plain.
•Ground Level: the ground level at the intermediate (Unit = elevation)
•Invert Level: :Level of the pipe at the intermediate (Unit = elevation)
Units: Time
Status: Result
The lag is the time it takes for the flow to move through the pipe. Lag is equal to the pipe length divided by the full flow velocity.
The lag for rising mains and siphons is 0.
Units: m
Status: Data - calculated
The calculated length of the pipe. This value is used for the pipe length if the pipe's length type is set to "C".
Units: None
Status: Data
The pipes length type determines whether the pipe length is calculated (C) or whether the user defined length (L) is used for the pipe length.
Units: None
Status: Data
The code of the link.
Units: L/s
Status: Result
The maximum flow in the pipe. For gravity pipes, this flow is also referred to as the maximum instantaneous peak flow.
Units: mm
Status: Result
The depth at maximum flow in the pipe.
Units: m/s
Status: Result
The velocity at maximum flow in the pipe.
Units: L/s
Status: Result
The maximum flow into the upstream structure of the pipe, excluding the flow from the land parcels contributing to the pipe and the user hydrographs connected to the pipe. The inflow to the pipe is equal to the sum of the flows in the pipes immediately upstream of the pipe.
Units: m/s
Status: Result
Maximum velocity in the rising main. The velocity in the rising main equals the maximum flow in the pipe divided by its area:

Units: L/s
Status: Result
The minimum flow in the pipe.
Units: mm
Status: Result
The depth at minimum flow in the pipe.
Units: m/s
Status: Result
The velocity at minimum flow in the pipe.
Abbreviation: Min InFlow
Units: Flow
Status: Result
The minimum flow into the upstream structure of the pipe, excluding the flow from the land parcels contributing to the pipe and the user hydrographs connected to the pipe. The inflow to the pipe is equal to the sum of the flows in the pipes immediately upstream of the pipe.
Units: m/s
Status: Result
The velocity in the pipe at the minimum flow.
Units: mm
Status: Data - modified if planning analysis results are accepted.
The original diameter of the pipe, before the pipes are designed. After the results of a planning analysis is accepted the modeled diameter is stored as the original diameter as a backup of the initial values
Units: L/s
Status: Result
An overflow occurs at a bottleneck in the system, where the pipe cannot transport the flow into it. The overflow is the volume of flow that exceeds the capacity of the pipe.
It is only calculated if the option to analyse overflows is on.
Units: mm
Status: When Planning Results are copied to model
The required new diameter of the pipe as determined during the planning analysis.
Units: mm
Status: When Planning Results are copied to model
The required diameter of the pipe that could be laid parallel to the existing pipe, which has violated the design criteria. The user must check that the result is a practical solution.
Units: Percentage
Status: Data Rising Mains
The percentage of flow from the pump structure routed down the rising main. The sum of the percentages of the downstream rising mains at a pump structure must equal 100%.
Units: Flow
Status: Result
The calculated ground water infiltration into the pipe. Ground water infiltration into the system through joints and connections at manholes and pipes. It is a constant flow and a function of length and diameter. A rate of 0.15 litres/min/meter length/meter diameter is typical.
Units: Percentage
Status: Result
The relative spare capacity is the hydraulic spare capacity expressed as a percentage of the relative capacity, that is the capacity of the pipe less the total upstream continuous pump flow rate.
If there are pumps upstream which pump at a continuous rate, it is necessary to consider the relative effect of these pumps on the spare capacity in the downstream pipes. It is known that part of the capacity must cater for the continuous pump flow. Any spare capacity should therefore be expressed as a percentage of the remaining available capacity ie. the relative capacity of the pipe which is the total capacity less the effect of the upstream pumps.
Refer to calculation of pipe spare capacity for details.
Units: Flow
Status: Planning Result
The capacity of the replacement pipe required to satisfy the design criteria.
Units: Value (Windows system variable)
Status: Planning Result
The cost of replacing the existing pipe with the designed pipe.
Units: Diameter
Status: Planning Result
The designed diameter determined in the planning analysis. After the planningresults are accepted this value becomes the modeled diameter.
Abbreviation: Repl Max Velocity
Units: Velocity
Status: Planning Result
Maximum velocity in the replacement rising main after it is designed. The velocity in the rising main equals the maximum flow in the pipe divided by its area.
Units: Velocity
Status: Planning Results
The velocity in the replacement pipe when it is at full flow.
Units: None
Status: Data
Manning roughness coefficient.
Units: m/m
Status: Data
The slope of the pipe (vertical distance for every unit of horizontal distance). The way in which the pipe's slope is calculated is determined by the slope type parameter.
Units: m/m
Status: Data
The inverse value of either the Slope (calculated slopes), or the User Defined Slope (where slope type is set to'S'). Slope 1:x is the horizontal distance for every unit of vertical distance.
Units: None
Status: Data
The pipes slope type determines how the pipe's slope is calculated:
•I (Inverts)
T he slope is the difference between the upstream and downstream invert levels relative to its length. If this option is chosen Sewsan checks that the upstream inverts of the pipes downstream of a manhole are lower than the downstream invert of the pipes upstream of the manhole.
•S (Slope)
The slope is the user defined slope. There are no checks on the invert levels.
•D (Datum)
The slope is the difference between the upstream and downstream invert levels relative to its length. There are no checks on the invert levels of the pipes. This option is used where there is a datum shift between sets of pipe inverts.
•M (Minimum)
The slope is determined so that the specified minimum slope velocity is obtained in the pipe. It is a function of minimum slope velocity and diameter.
•FM (Fixed Minimum)
During a planning analysis it is assumed that the existing pipes's slopes will remain constant, even if there diameter's change. The minimum slope is a function of the pipe's diameter. Therefore, if the diameter of an existing pipe with a minimum slope type is changed during a planning analysis the slope type is changed from minimum to fixed minimum and the slope is set equal to the minimum slope calculated on the original pipe diameter.
The user cannot set a pipe's slope to fixed minimum, it is changed during the planning analysis.
•E (Estimate)
The pipes slope was estimated based on the invert levels of its upstream and downstream pipes.
The user cannot set a pipe's slope to estimated, it is changed during the function to calculate the user slope.
Units: None
Status: Data
The storm type for the pipe. It must be one of the storms defined in the rain storm data. It is used to calculate the storm water ingress to pipe.
Units: L/s
Status: Result
The hydrograph flow is shown for each simulated time interval.
Units: None
Status: Data
The code of the downstream structure.
The N icon will perform the Select New Downstream Structure function.
Units: m
Status: Data
The cover level of the downstream manhole.
Units: m
Status: Data
The ground level of the downstream manhole.
Units: m
Status: Data
The invert level at the downstream structure.
Units: h
Status: Result
The total lag at a pipe is the time it takes for the flow entering the upstream end of the pipe to reach the end manhole of the system. If there is a downstream diversion structure the total lag is calculated through the first downstream pipe linked to the diversion structure.
Units: None
Status: Data
The type of the pipe.
Units: m
Status: Data
The user defined length of the pipe. It is used as the pipe length if the length type is set to 'L'.
Units: m/m
Status: Data
The user defined pipe slope (vertical distance for every unit of horizontal distance). It is used as the pipe slope if the slope type is set to 'S'.