|
<< Click to Display Table of Contents >> Navigation: Sewsan 6 Tutorial > Sewsan 6 Tutorial: step-by-step > Capturing, editing and saving the model data |
The model data has to be defined/captured (before the system can be analysed) via the following steps:
•Adding entities (pipes and manholes)
•Assigning demand and units (equivalent erven) to structures
•Assigning ground elevations to structures
In this section, the composition of the model data tables will also be discussed, as well as the procedure to save the system data.